999免费网站,欧美伊人网,日本α片一区二区,白天操夜夜操,欧美日韩中文不卡,亚洲综合一区二区三区不卡,吊视频一区二区三区

Hello, welcome to visit the official website of Quzhou Wentian Chemical Co., Ltd.
Service Tel: +86-570-3083319 中文English

PRODUCTS

+ High Molecular Fluoropolymer Self-adhesive Coiled Material+ Fluorocarbon anti-corrosion coating series+ Fluorocarbon building exterior wall waterproof decorative coating+ Fluorosilicone Nano Bamboo Wood Anticorrosive Coating+ Thermal insulation coating+ Glass explosion-proof insulation film
Fluorocarbon Steel Structure Anticorrosion Coating

 

Product introduction: This product is made of fluorocarbon resin, high-quality pigments, fillers, BYK and other excellent additives. It is a two-component reactive coating with Bayer curing agent to form a film. It can effectively prevent the base surface from being damaged by various corrosive media and prolong the service life of the coated object.

Uses: It can be widely used in common steel components, bridges, and chemical anticorrosion.

Features: This is a coating product specially developed for the daily anticorrosion maintenance of steel structure workshops and chemical installations, and the protection of urban steel structures. After the coating product is formed into a film, it has better anti-ultraviolet, anti-chemical corrosion, high weather resistance and scratch resistance functions.

Construction method: deployment in strict proportion. First mix the curing agent and the paint thoroughly and cure for 15 minutes, then add the thinner. In the production process of this product, special consideration is given to the construction requirements, so it can be painted by brush, spray or roller. The surface coating is constructed with a special anti-corrosion primer. The general process is one base and two sides or two bases and two sides. This product is a two-component reactive coating, which should be used within 4 hours after mixing.

Drying time: temperature 25 ℃, surface dry 30 minutes, hard dry 24 hours. Fully cured for 5-7 days.

Coating interval: more than 4 hours.

Storage: Cap tightly sealed. Store in a cool, clean, dry place. The shelf life is 2 years.

Surface treatment: remove floating rust and welding slag spatter on the surface of the workpiece, and carry out dust and oil removal.

Construction conditions: The humidity during construction is less than 75%, and the construction temperature is 5°C-40°C. Construction is strictly prohibited in rainy, snowy and foggy weather.

Safety and Precautions: Ensure that the construction site has good ventilation. Keep away from open flames, no smoking at the construction site, and avoid paint splashing on eyes and skin.

Supporting primer: anti-corrosion special primer

 

  
Contact us
Dazhou Town Industrial Zone, Qujiang District, Quzhou City
Tel: + 86 570 3071 340
Mobile phone: + 86 133 6201 6666
E-mail: wentian@163.com
Mobile
Copyright(C)2023, Quzhou Wentian Chemical Co., Ltd. All Rights Reserved. Supported by  ChemNet ChinaChemNet Toocle
肥城市| 天台县| 和田县| 望江县| 景德镇市| 西平县| 廊坊市| 额尔古纳市| 贺州市| 京山县| 开远市| 介休市| 汝州市| 桦川县| 大港区| 罗山县| 达孜县| 双城市| 花莲市| 吴忠市| 东光县| 寿阳县| 闻喜县| 班玛县| 措勤县| 巴东县| 海门市| 阳山县| 翁牛特旗| 甘谷县| 岑巩县| 盐池县| 乐亭县| 凤庆县| 界首市| 图片| 安化县| 页游| 古交市| 恭城| 琼结县|